How do I bring values into Peak Constraints via CSV?

In the system editor under “Apply values from CSV”. One row per step, with columns step, capacity, load, throughput, queue, utilization, lost, separated by semicolon, comma or tab. German and English column names both work. Peak matches the rows to your steps by name; it reports unknown steps but doesn't create them.

  1. Open Peak Constraints → System.
  2. Paste the CSV into the field or click “Choose file”.
  3. Click “Apply” and read the message about which steps were updated.
  4. Click “Save and recalculate” so the diagnosis uses the new values.

Next step

Open system

Explains this message

  • The file needs a header row and at least one row with values.

Did this solve your problem?

Your rating stays in this browser for now.

Not solved? Write to us.

Prepare an email to the Peak Atlas team. Your question and the articles you have already read are included. You confirm sending it in your email app.

Create a request